Network Diagram From Activity Table

A network diagram converts a table of project activities and dependencies into a visual flow, making it easy to identify the critical path. Project managers use this to plan schedules and spot scheduling risks early. Tip: highlight the critical path in a distinct color so stakeholders immediately see which tasks have zero slack.

Customize with AI — free Open in draw.io

The prompt behind this diagram

Create a project management network diagram (activity-on-node) derived from a typical activity table with tasks: Start, Task A (duration 3 days, no predecessor), Task B (duration 5 days, depends on A), Task C (duration 2 days, depends on A), Task D (duration 4 days, depends on B and C), Task E (duration 3 days, depends on D), and End. Show each task as a node with duration labeled, arrows indicating dependencies, and highlight the critical path through Start, A, B, D, E, End with a distinct color.

Paste your own description (or Terraform / docker-compose / SQL schema) into draft1 and get a diagram like this for your exact system.

What this diagram shows

This diagram visualises project tasks as nodes connected by dependency arrows, derived from an activity table listing each task's duration, predecessors, and successors. It displays the logical sequence of work, showing which tasks must complete before others begin, and highlights the critical path - the longest sequence of dependent activities that determines minimum project completion time. Time estimates appear on nodes or edges, allowing visual identification of scheduling constraints and slack time in non-critical tasks.

Key components

When to use it

Use this diagram when managing projects with multiple interdependent tasks and you need to communicate scheduling logic, identify scheduling bottlenecks, and calculate project duration. It is essential for PERT and CPM scheduling, resource planning, and explaining why certain tasks are time-critical. Suitable for construction, software development, product launches, and any work with clear task sequences where delay propagation matters.

Common mistakes

Adapting it to your system

Extract task names, durations, and predecessor/successor relationships from your project schedule or work breakdown structure. Create one node per task with its duration prominently displayed. Draw arrows from each task to its immediate successors only, avoiding redundant transitive edges. Calculate earliest start and finish times using forward pass, then latest times using backward pass. Identify tasks where slack equals zero and highlight them as the critical path. Adjust node layout horizontally by time phase to reinforce the schedule visually.

More templates

System Architecture Diagram

Generate a clear system architecture diagram online and export an editable draw.io file in seconds with AI.

Network Topology Diagram

Draw a network topology diagram instantly with AI and download it as an editable draw.io file for your documentation.

Aktivitätsdiagramm Für Eine Java-Methode Erstellen

Erstellen Sie ein UML-Aktivitätsdiagramm für Java-Methoden mit KI und exportieren Sie es als editierbare draw.io-Datei

Diagram Przypadków Użycia UML

Wygeneruj diagram przypadków użycia UML online za pomocą AI i pobierz edytowalny plik draw.io.

Cloud Architecture Diagram

Create a cloud architecture diagram with AI and export it instantly as an editable draw.io file.

Cloud Infrastructure Diagram

Generate a detailed cloud infrastructure diagram online using AI and export it as an editable draw.io diagram.

Business Process Flowchart With Decision Points

Build a business process flowchart with decision points using AI and download an editable draw.io file.